Yes. A rental UPS can be used to provide temporary critical-power capacity during a data center UPS replacement, infrastructure upgrade, planned maintenance or other project where the permanent UPS system needs to be taken out of service.
Temporary UPS equipment can help maintain power protection while permanent equipment is being serviced, removed, installed or commissioned. The rental system should be selected around the data center’s actual load, voltage, electrical configuration, runtime requirements and project schedule.
Critical Infrastructure Group provides UPS Rental Systems for data centers and other mission-critical facilities, along with permanent UPS equipment for replacement and expansion projects.
When Does a Data Center Use a Rental UPS?
A rental UPS can be incorporated into a variety of planned data center projects. Common applications include:
- UPS system replacement
- Planned UPS maintenance
- Battery or component service
- Data center capacity expansion
- Electrical infrastructure upgrades
- Facility renovations
- Equipment installation and commissioning
- Short-term or transitional power requirements
The temporary equipment provides another option for maintaining conditioned UPS power while work is completed on the permanent critical-power infrastructure.
A Rental UPS Can Support a Planned UPS Replacement
UPS replacement projects often involve several stages, including removal of existing equipment, installation of the replacement UPS, electrical connections, startup and commissioning.
A temporary UPS can be incorporated into the project plan to support designated critical loads during that transition.
This can be particularly useful when an existing UPS is being replaced with a larger system, a different manufacturer or a new configuration designed around future data center growth.
If you are evaluating permanent replacement equipment, see When Should a Data Center UPS Be Replaced?
CI Group offers new, surplus and refurbished UPS systems for replacement projects, allowing temporary and permanent equipment requirements to be considered together.
Rental UPS Equipment Can Also Support Planned Maintenance
Temporary power is not limited to full UPS replacements. It can also be useful when a maintenance project requires part of the existing critical-power system to be taken out of normal operation.
NFPA 70B establishes requirements for electrical equipment maintenance programs and addresses preventative maintenance for electrical equipment used in commercial and industrial facilities.
Learn more about NFPA 70B electrical equipment maintenance requirements.
For facilities planning ongoing UPS service, see How Often Should a Data Center UPS Be Maintained?
CI Group also provides UPS Preventative Maintenance & Inspection Services for data centers and other critical-power environments.
How Is the Right Rental UPS Selected?
A rental UPS needs to be matched to the electrical and operating requirements of the load it will support. Before equipment is selected, the project team should identify several important specifications:
- Required UPS capacity in kW and kVA
- Input voltage
- Output voltage
- Single-phase or three-phase configuration
- Critical load to be supported
- Required battery runtime
- Required redundancy
- Connection and bypass requirements
- Available installation space
- Project start date and expected rental duration
Providing these specifications allows CI Group to identify rental equipment that is appropriately matched to the application.
If the required UPS capacity is still being determined, see What Size UPS Does a Data Center Need?
Battery Runtime Should Be Included in the Rental Specification
The temporary system should also provide the runtime required by the data center’s backup-power strategy.
That runtime may be designed to support the critical load while backup generation becomes available or to meet another facility-specific operating requirement.
The required runtime, connected load and selected rental UPS should therefore be considered together when configuring temporary equipment.
See How Much UPS Battery Runtime Does a Data Center Need? for more information about battery capacity and runtime planning.
Rental UPS Equipment Can Help Support Data Center Expansion
Temporary UPS equipment can also be useful when a data center is adding capacity.
For example, a facility may be preparing for new IT equipment while permanent electrical upgrades are still being completed. A rental system can provide temporary capacity during a defined project period while the permanent UPS infrastructure is installed or expanded.
This can be especially useful for projects involving higher-density computing where both immediate capacity and longer-term infrastructure requirements are being addressed.
For AI and GPU projects, see Power Infrastructure Requirements for AI Data Centers.
Plan the Rental and Permanent UPS Together
When a rental UPS is being used as part of a replacement or expansion project, it can be helpful to plan the temporary and permanent systems at the same time.
The temporary equipment can be selected around the immediate project requirement while the permanent UPS is selected around:
- Current data center load
- Future capacity requirements
- Required redundancy
- Battery runtime
- Electrical configuration
- Available equipment
- Long-term expansion plans
CI Group can support both sides of the project with temporary UPS rental equipment and permanent UPS systems for new installations, replacements and capacity expansion.
Rental Equipment Adds Flexibility to a Data Center Power Project
A UPS upgrade or replacement can be planned without treating temporary power as a separate last-minute requirement. Incorporating a rental UPS into the project from the beginning gives the data center another way to maintain critical-power support while permanent infrastructure work moves forward.
Critical Infrastructure Group provides UPS rentals nationwide and can also support permanent UPS sourcing, battery replacement, preventative maintenance and broader Data Center Power Infrastructure solutions.