What Size UPS Does a Data Center Need?

The right UPS size for a data center depends on the critical load it will support, the electrical configuration of the facility, redundancy requirements, desired battery runtime and planned future growth. For a new installation or expansion, the goal is to select a UPS configuration that provides the required capacity today while leaving appropriate room for redundancy and future equipment.

Critical Infrastructure Group supplies UPS systems across a broad range of capacities and manufacturers, including large three-phase systems for data centers and other mission-critical applications.

Start With the Critical Data Center Load

UPS sizing begins by identifying the equipment that needs uninterrupted power and determining its expected electrical demand.

For a data center, this commonly includes servers, storage, networking equipment and other critical IT systems. The project team should establish both the kilowatt (kW) and kilovolt-ampere (kVA) requirements because commercial UPS systems are specified using both measurements.

Useful information to have available when sourcing a UPS includes:

  • Current critical load in kW and kVA
  • Required input and output voltage
  • Single-phase or three-phase requirements
  • Expected peak load
  • Required redundancy configuration
  • Desired battery runtime
  • Planned facility or IT expansion
  • Available installation space

Once those requirements are established, CI Group can help identify UPS equipment that fits the application rather than limiting the search to a single manufacturer or capacity range.

Include Planned Growth in UPS Sizing

A new UPS system may remain in service through several generations of computing equipment, so sizing should account for realistic expansion plans as well as today’s load.

The U.S. Department of Energy recommends considering both initial and future loads when selecting electrical equipment for data centers. Its data center design guidance also discusses UPS configuration, load factor and redundancy as part of efficient electrical-system planning.

Review the U.S. Department of Energy’s Best Practices Guide for Energy-Efficient Data Center Design.

For facilities planning AI, GPU or other high-density computing additions, see Power Infrastructure Requirements for AI Data Centers for additional considerations that can affect the supporting power infrastructure.

Redundancy Affects How Much UPS Capacity Is Required

UPS capacity is not based only on how much power the connected equipment uses. The desired power architecture also matters.

A facility designed with redundant UPS capacity needs enough installed equipment to support the required load while maintaining the redundancy level selected for the data center.

Uptime Institute’s Tier framework distinguishes between basic capacity, redundant capacity components, concurrent maintainability and fault tolerance. These concepts can help owners and engineering teams define the availability objectives the electrical system is expected to support.

Review Uptime Institute’s Data Center Tier Classification System.

For a more focused explanation, see What Is N+1 Redundancy in a Data Center Power System?

Battery Runtime Is Part of the UPS Configuration

UPS capacity and battery runtime are separate parts of the specification. After the required UPS capacity is established, the battery system can be configured around how long the critical load needs to remain supported before generator power is available or another planned operating sequence takes place.

Facilities expanding an existing UPS system should also review whether the current battery configuration provides the desired runtime at the new load level.

Learn more in How Much UPS Battery Runtime Does a Data Center Need?

CI Group also provides UPS Battery Replacement Services for facilities updating or maintaining existing battery systems.

Expanding an Existing Data Center?

An expansion project is a good opportunity to compare the capacity of the existing UPS with newer or additional equipment options.

The review can consider the current system configuration, available capacity, battery system, planned computing load and future expansion. Depending on the project, the right solution may involve adding capacity, replacing an existing UPS, updating supporting components or installing a new UPS configuration better suited to the facility’s next stage of growth.

CI Group offers UPS Maintenance Services for existing systems and maintains equipment options across a wide capacity range for replacement and expansion projects.

Large Data Centers May Require High-Capacity UPS Systems

For facilities with substantial critical loads, CI Group offers large three-phase UPS equipment, including 1201+kVA UPS systems.

Available equipment can include new, surplus and refurbished options, giving data center operators additional ways to match capacity, manufacturer preferences, project schedules and budget requirements.

Looking for the Right UPS for a Data Center Project?

Share your capacity, voltage, redundancy and project requirements with CI Group. We can help identify available UPS equipment for new construction, facility expansion or system replacement.

Discuss Your Data Center Project →

Scroll to Top